A Modern Mobile Platform for Millions of Utility Customers.
Our client is one of the oldest and largest energy companies in the United States, delivering electric and gas service to millions of customers across the East Coast. Its highly rated mobile app had outgrown the architecture supporting it, so the company brought in Goji Labs to run a technical audit and product strategy sprint that turned a decade-old platform into a fully scoped, phased rebuild.

The Challenge
The mobile app performed well by every customer-facing measure. Ratings sat near the top of its category, adoption was strong, and the app supported core transactions like bill payment, outage reporting, program enrollment, and service transfers. The difficulty was not the experience customers saw, it was everything required to change it.
Large parts of the app were built as extensions of the company’s web platform, so a mobile improvement often depended on the roadmap of a separate web team. Content, usage data, and payments each ran through their own backend system, each with its own owners and release cycle, which meant even small feature changes moved slowly for reasons that had nothing to do with mobile engineering itself.
The company wanted its app measured against the consumer products its customers use daily in banking and retail, not against other utilities. Reaching that bar meant changing how the product gets built and governed, not just how it looks, which is why leadership brought in Goji Labs before committing budget to a rebuild.

Our Process
Goji Labs opened with a technical architecture audit rather than a design exercise. Our team traced every constrained workflow in the app back to the system or dependency actually responsible for it, mapping out what the mobile team controlled directly versus what sat behind a separate platform or team. That map became the technical backbone of the entire rebuild case.
In parallel, we ran research and market-context work across the teams that own each customer journey inside the organization, from billing to outage response to program enrollment, and paired those sessions with real usage and transaction data rather than years-old personas. That combination surfaced both the features that needed a redesign and a handful of gaps, including a regulatory requirement around comparing third-party energy suppliers, that had never been scoped before.
We then built a comparison framework to turn all of that into decisions leadership could actually act on: an epics and features workbook that tagged every one of 109 features by objective, delivery phase, and origin (already in the app, newly recommended, or a platform capability customers never see), with an estimated day range attached to each. That let leadership trade scope against budget on paper instead of in a meeting. The plan also laid the groundwork for a shared design system across iOS and Android as part of the platform foundation, alongside the CI/CD, testing, and identity-architecture work needed to support faster releases going forward.


The Impact
The strategy and technical audit gave the client something it hadn’t had before: a rebuild plan detailed enough to defend in front of executives and specific enough to fund. What started as a single product strategy sprint cleared internal review and expanded into a full engagement covering design, mobile development, legacy app support, and a related authenticated web assessment.
The clearest win was speed of decision-making. Rather than debating whether to rebuild the app, leadership could review a single workbook and decide which of 68 first-phase features to commit to, because every feature already carried a cost estimate and a business objective attached to it. The audit also surfaced a foundation-level dependency problem that had been quietly slowing every past release, and gave the team a sequenced way to fix it before building anything customer-facing on top.
The engagement produced a 14-week design roadmap, with a decision-maker and review point assigned to every epic, giving the client a governance structure it can reuse well past this first phase.
- Scoped 15 epics and 109 features across a 3-phase roadmap: Now (68 features), Next (25), and Later (16)
- Classified every feature by origin, separating 48 existing app features from 51 new recommendations and 10 platform-only capabilities
- Identified and scoped a previously unaddressed regulatory gap around third-party energy supplier comparisons
- Delivered a 14-week, 7-sprint design roadmap with a named decision-maker and review checkpoint per epic
- Expanded the engagement from a single strategy sprint into design, mobile development, legacy app support, and a related web platform assessment

